Free BICSI RCDD-002 Exam Questions

Become BICSI Certified with updated RCDD-002 exam questions and correct answers

Page:    1 / 73      
Total 361 Questions | Updated On: Jul 29, 2025
Add To Cart
Question 1

Using the "pathway design" for horizontal cable distribution, how many cable runs are placed to serve 15 individual? 


Answer: C
Question 2

A work breakdown structure is: 


Answer: A
Question 3

If a telecommunications grounding busbar is installed in the telecommunications room (TR) with the identifier of 310, located on the third floor, then the telecommunications grounding busbar should be labeled as:


Answer: A
Question 4

Which of the following is NOT considered acceptable in an information technology system (ITS) conduit design and installation? 


Answer: D
Question 5

When a building is not on the property line, the building owner should provide a MINIMUM of ________ conduits from a point inside the building, to the property line or easement for entrance facilities.


Answer: D
Page:    1 / 73      
Total 361 Questions | Updated On: Jul 29, 2025
Add To Cart

© Copyrights DumpsCertify 2025. All Rights Reserved

We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the DumpsCertify.