During the preparation of the construction documents, it was noted that the survey inaccurately located the property line. Consequently, the parking layout had to be redesigned to fit within the corrected property boundary. The architect's additional costs and associated delay are the responsibility of which one of the following parties?
What is the primary purpose of a construction schedule?
The architect's contract with the owner has a budget of construction cost, and the architect has established a budget of cost in the mechanical engineer's contract. The mechanical bid package is 36% over the budget. What is the engineer required to do?
During the predesign phase of a project, the architect discovers that the owner's budget is insufficient to meet the program requirements. Which of the following should the architect do?
The architect is on site to evaluate the completed work by the contractor. During the evaluation, the architect notices a structural connection that deviates from the contract documents. According to AIA B101, to which party should the architect report this observed deviation?