Pressure tests for organic coating process piping shall be conducted for a minimum of:
At each grinding, buffing, or wire brushing operation on magnesium, other than the rough finishing of casting, dust must be collected by means of suitable hoods or enclosures connected to a:
At each grinding, buffing, or wire brushing operation on magnesium, other than the rough finishing of casting, dust must be collected by means of suitable hoods or enclosures connected to a:
The minimum fire-flow for a 3,700-sq. ft. two-family dwelling of Type VB construction with a sprinkler system is ___ GPM.
Paint spray booths must have a clearance of ___ in. from unprotected combustible materials.