Question 1

A major theme park is expanding the existing facility over a five-year period. The design phase will becompleted one year after the contract is awarded. Major engineering drawings will be finalized two years afterthe design contract is awarded and construction will begin three years after the award of the design contract.New, unique ride technology will be used and an estimate will need to be developed to identify these costs thathave no historical data.A cyclical process model was chosen as the basis for total cost management (TCM) because:


Answer: C
Question 2

A major theme park is expanding the existing facility over a five-year period. The design phase will becompleted one year after the contract is awarded. Major engineering drawings will be finalized two years afterthe design contract is awarded and construction will begin three years after the award of the design contract.New, unique ride technology will be used and an estimate will need to be developed to identify these costs thathave no historical data.Cost engineers who feel completely satisfied and fulfilled by their work as part of a project team are said tohave reached the ______________ stage of Maslow's hierarchy of needs.


Answer: C
Page:    1 / 24      
Total 118 Questions | Updated On: Jul 28, 2025
Add To Cart

© Copyrights DumpsCertify 2025. All Rights Reserved

We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the DumpsCertify.