Free Online Cisco 300-620 Practice Test

Prepare Your Cisco 300-620 Exam Questions with Free online 300-620 Practice Test. Get Brilliant Implementing Cisco Application Centric Infrastructure Exam Results with Valid 300 620 Exam Dumps.

Page:    1 / 59      
Total 294 Questions | Updated On: Jul 20, 2024
Add To Cart
Question 1

The existing network and ACI fabric have been connected to support workload migration. Servers will physically terminate at the Cisco ACI, but their gateway must stay in the existing network. The solution needs to adhere to Cisco’s best practices. The engineer started configuring the relevant Bridge Domain and needs to complete the configuration. Which group of settings are required to meet these requirements?


Answer: B
Question 2

27

Refer to the exhibit. An engineer wants to initiate an ICMP ping from Server1 to Server2. The requirement is for the BD1 to enforce ICMP replies that follow the expected path. The packets must be prevented from taking the direct path from Leaf1 to Server1. Which action must be taken on BD1 to meet these requirements?


Answer: C
Question 3

What must be configured to allow SNMP traffic on the APIC controller?


Answer: B
Question 4

56

Refer to the exhibit. The EPG-100 must be extended to the vCenter as a port group with a tagged VLAN ID of 100. Which set of actions accomplishes this goal?


Answer: A
Question 5

43

Refer to the exhibit. An engineer configures an L3Out but receives the error presented. Which action clears the fault?


Answer: A
Page:    1 / 59      
Total 294 Questions | Updated On: Jul 20, 2024
Add To Cart

© Copyrights DumpsCertify 2024. All Rights Reserved

We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the DumpsCertify.