Free Cisco 300-510 Exam Questions

Become Cisco Certified with updated 300-510 exam questions and correct answers

Page:    1 / 55      
Total 271 Questions | Updated On: Jan 27, 2026
Add To Cart
Question 1

Refer to the exhibit.The four routers in this network have formed adjacencies. Router R2 is an IS-IS level 1-2 router that connects to other areas, and the attach bit is set in the R2 level 1 LSP advertisements to R1. According to the network design, R2 should push level 2 routes from its routing table to the R1 routing table. However, R1 installed a default route in its routing table. Which action resolves this problem?  


Answer: C
Question 2

Refer to the exhibit.

25
Refer to the exhibit. After a recent network implementation project, customer A is performing stress testing to verify network redundancy at the branch office connected to R4. When the link from R2 is shut own as shown, the SLA tracking object fails and the cost of the link between R2 and R4 increases to 100. However, a traceroute operation from a PC in the Branch office shows that traffic to HQ is still routed via R2. Which solution corrects the problem and optimizes traffic flow via R3 without creating operational overhead?


Answer: B
Question 3

Refer to the exhibit.IS-IS is the IGP for the network, where routers R1. R2 R3, and R4 are Level 1 routers in Area 12 and routers R5 and R6 are Level 2 routers m area 16 According to the network design router R1 must send traffic to R6 using R4 as its next hop To meet the requirement, a network engineer configured route filtering on R2 to prevent the route to R6 from being advertised from R2 However R1 is still using R2 as the next hop Which action must the engineer take to resolve the issue?  


Answer: D
Question 4

Refer to the exhibit.OSPF is running in the core of a company. Router RA is running EIGRP. After the company acquired an additional office, an engineering team connected the two networks from router RA to router R1. OSPF and EIGRP have been mutually redistributed on R1. but the team cannot view the routes on R3. Which action must the team take to resolve the issue?  


Answer: C
Question 5

Refer to the exhibit.

103
A network engineer configured routers R1 and R5 to run in IS-IS Level 1 mode and router R6 to run in IS-IS Level 2 mode. All other routers are running as Level 1 / Level 2 routers. An engineer expects traffic from R1 to R6 to pass via R2, but IS-IS routing has calculated the best path via R4. Which action corrects the problem?


Answer: C
Page:    1 / 55      
Total 271 Questions | Updated On: Jan 27, 2026
Add To Cart

© Copyrights DumpsCertify 2026. All Rights Reserved

We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the DumpsCertify.