Question 1

In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a
product. The cost of the assembly is calculated by using the standard costing method. The work definition and
resource rates of the assembly have been defined as required.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing
estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up
costs, the extended costs of purchase components are not included in a rolled-up scenario.
Identify the reason.


Answer: A
Question 2

You want to use a predefined Standard Operation in a Work Definition, but you also want to change the usage of the Standard Operation resource. Identify the setup required.


Answer: B
Question 3

Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional Operation.


Answer: A,B
Question 4

You can generate and manage work order exceptions in Oracle Manufacturing Cloud. Which users can report production exception and who gets notified after an exception is raised?


Answer: B
Question 5

A customer has a distribution warehouse (DW) for After Sales and Service and an in-house manufacturing plant (MP). Sales orders are created and shipped from DW. Identify the two Sourcing Rules that need to be set for order promising to schedule the order.


Answer: A,D
Page:    1 / 23      
Total 111 Questions | Updated On: Dec 07, 2025
Add To Cart

© Copyrights DumpsCertify 2025. All Rights Reserved

We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the DumpsCertify.